|
Sturbridge Facility West Brookfield Facility |
PTA/Structural WeldingArland Tool's Plasma Transferred Arc System (PTA) is a high energy, inert gas welding process. Our automated computer controlled process produces a very high quality deposit offering optimal protection with minimal dilution or deformation of the base material. Perfectly controlled alloys are deposited on mechanical parts that are subject to intense wear, significantly extending their service life.
|
||||||||